Six project studies across energy modelling, Al Sa’fat compliance, LEED advisory, daylighting, digital twin integration and embedded advisory. Client identities withheld — details accurate.
Developer with a repeating villa typology across three plot orientations needed to confirm energy compliance before fixing the structural design. Changes post-tender would have been prohibitively expensive.
Parametric massing models in DesignBuilder for each orientation variant. WWR, shading depth and U-value sensitivity tested across 12 design permutations. Scenario comparison report per plot type.
Design team fixed orientation and shading spec at EDP — before structural drawings. Compliance confirmed with zero revision cycles at submission.
Architecture practice at WD stage, submission eight weeks away. Previous submission by another consultant had been rejected by DM.
Full IES VE thermal model from WD drawings. ApacheHVAC system model calibrated to specified plant. Al Sa’fat matrix and DM-formatted submission pack including all technical annexes.
Pack delivered in five weeks. Authority approval on first resubmission. Zero post-submission RFIs. Practice engaged GGD for two further projects at DD stage.
Interior designer needed daylighting and solar glare analysis for a high-occupancy restaurant with full-height south-west glazing. Evidence needed for both shading specification and FF&E layout.
RadianceIES annual CBDM with SunCast solar penetration studies. Spatial daylight autonomy maps and glare probability (DGP) across peak occupancy periods. Three shading variants compared.
Shading depth confirmed at DD. Seating layout adjusted to avoid peak glare zones. Client used visualisations in their design review presentation to the operator.
Large operational asset with significant variance between designed and actual energy consumption. No calibrated model. Developer needed a credible net zero pathway for investor reporting.
iSCAN digital twin from metered data and as-built drawings. Gap analysis per end-use. Improvement measures ranked by cost-per-tonne-CO₂e. Net zero roadmap for board-level ESG reporting.
Four measures prioritised and quantified. Developer adopted roadmap for UAE Net Zero 2050 disclosure. FM team retained GGD for ongoing monitoring.
PMC team had committed to LEED Silver without a credit-by-credit cost analysis. Several credits assumed achievable required significant contractor specification changes — mid-tender.
Full credit gap assessment against issued tender package. Prioritised substitution plan delivered in two weeks. EAp2 energy model in DesignBuilder. LEED Online documentation managed to certification.
LEED Silver achieved without reopening tender. Three credits recovered via documentation-only substitutions. Specification change order of AED 340,000 avoided.
Developer with a phased scheme across four plots, three different design consultants at different stages. No single party held the compliance overview.
GGD embedded as sustainability lead across all four plots. Bi-weekly design reviews with each consultant. Live compliance matrix per plot. Coordinated authority RFI responses across two submission rounds.
All four plots achieved compliance approval within the developer’s phased handover schedule. Developer reported embedding GGD removed a consistent source of inter-consultant coordination friction.
Further references and detailed technical case studies available under NDA on request.